This is a shot of Beto and his son putting up the 3" galvanized steel pole. Josh Fellman will arrive tomorrow and Monday he and his crew will begin installation of the satellite. We had torrential rains and high winds last night and it was looking doubtful that they would be able to work today, but the rain stopped early this am and now the sun is breaking through. The hole is 3-4 feet down with a 3' cross bar and they will seal it with concrete.